  • Case Studies 09/24/2020

    PLUMBING SOLUTION FOR INNOVATIVE WOODEN BUILDING

    OBJECTIVE: Provide plumbing for coffee bars and kitchenettes on each level of a multistorey wooden building. CHALLENGE: Core drilling may compromise or degrade the integrity of the timber building.

    Read more
  • Case Studies 09/24/2020

    KITCHEN RELOCATION AND NEW EN-SUITE

    OBJECTIVE: Relocate kitchen to a discreet corner room CHALLENGE: Strict heritage building plumbing restrictions SOLUTION: Sanivite grey water pump

    Read more
  • Case Studies 09/24/2020

    LUXURY CABIN

    OBJECTIVE: To renovate the heritage cabins and create an inclusive luxurious experience CHALLENGE: Plumbing solution required for the elevated bathroom drainage Solution: Sanicubic 1 WP

    Read more
  • Case Studies 09/24/2020

    MAGUIRE UPPER LIMB CLINIC

    OBJECTIVE: Create a purpose-built clinic with all the amenities. CHALLENGE: Plumbing solution required for a top floor, high rise with a strict strata title. SOLUTION Sanispeed+, Saniaccess 3 and Sanicom

    Read more
  • Case Studies 09/24/2020

    SURAT BASIN MINING CAMP

    OBJECTIVE: To create all-inclusive accommodation for multiple temporary mining camps. CHALLENGE: Plumbing solution that complies with strict environmental regulations. SOLUTION: Sanicubic 2 Pro, Sanicom 1 and Sanibest Pro

    Read more