Case Studies
-
Case Studies 10/16/2020
KITCHEN RELOCATION AND NEW EN-SUITE
OBJECTIVE: Relocate kitchen to a discreet corner room CHALLENGE: Strict heritage building plumbing restrictions SOLUTION: Sanivite grey water pump
Read more -
Case Studies 10/09/2020
FROM UNDERGROUND DIRT TO DREAM STUDIO APARTMENT
OBJECTIVE: Create a private retreat/multipurpose space. CHALLENGE: Plumbing needed under the sewerage and stormwater mains. SOLUTION: Saniflo Sanicubic 2 Pro WP.
Read more -
Case Studies 10/02/2020
LUXURY CABIN
OBJECTIVE: To renovate the heritage cabins and create an inclusive luxurious experience CHALLENGE: Plumbing solution required for the elevated bathroom drainage Solution: Sanicubic 1 WP
Read more -
Case Studies 09/30/2020
END OF TRIP FACILITY, MONASH CONFERENCE CENTRE, MELBOURNE, VIC
OBJECTIVE: Create an end of trip facility complete with showers. CHALLENGE: Plumbing needed in the basement of a multistorey office building. SOLUTION: Sanifloor
Read more -
Case Studies 09/28/2020
SERVICE STATION COFFEE MACHINES, NATION-WIDE
OBJECTIVE: Achieving drainage for new coffee machines in service station nation-wide. CHALLENGE: Plumbing needed in existing stores with no plumbing ports. SOLUTION Sanispeed
Read more