-
Case Studies 06/01/2022
DENTAL CLINIC (Sanispeed and Sanicom)
OBJECTIVE: Create a fully functioning dental clinic. CHALLENGE: Plumbing needed in a major, multistorey retail centre. SOLUTION Sanispeed and Sanicom
Read more -
Case Studies 04/06/2022
FROM UNDERGROUND DIRT TO DREAM STUDIO APARTMENT ( Sanicubic2 Pro)
OBJECTIVE: Create a private retreat/multipurpose space. CHALLENGE: Plumbing needed under the sewerage and stormwater mains. SOLUTION: Saniflo Sanicubic 2 Pro WP.
Read more -
Case Studies 11/09/2021
EARLY LEARNING CENTRE ( Sanispeed, Sanaccess2 and Sanicom1)
OBJECTIVE: To create a space with all essential amenities CHALLENGE: Plumbing needed in a multistorey building on a concrete slab SOLUTION Saniseed, Saniaccess 2 and Sanicom 1
Read more -
Case Studies 10/02/2020
LUXURY CABIN ( Sanicubic1)
OBJECTIVE: To renovate the heritage cabins and create an inclusive luxurious experience CHALLENGE: Plumbing solution required for the elevated bathroom drainage Solution: Sanicubic 1 WP
Read more -
Case Studies 09/30/2020
END OF TRIP FACILITY ( Sanifloor)
OBJECTIVE: Create an end of trip facility complete with showers. CHALLENGE: Plumbing needed in the basement of a multistorey office building. SOLUTION: Sanifloor
Read more