-
Case Studies 09/30/2020
END OF TRIP FACILITY ( Sanifloor)
OBJECTIVE: Create an end of trip facility complete with showers. CHALLENGE: Plumbing needed in the basement of a multistorey office building. SOLUTION: Sanifloor
Read more -
Case Studies 09/28/2020
SERVICE STATION COFFEE MACHINES, NATION-WIDE ( Sanispeed)
OBJECTIVE: Achieving drainage for new coffee machines in service station nation-wide. CHALLENGE: Plumbing needed in existing stores with no plumbing ports. SOLUTION Sanispeed
Read more -
Case Studies 09/24/2020
ORMEGGIO RESTAURANT AT THE SPIT IN SYDNEY ( Sanicubic2 Pro)
OBJECTIVE: Complete a fine dining restaurant with its own bathroom facilities CHALLENGE: Plumbing needed in a restaurant situated on the wharf SOLUTION Sanicubic 2 Pro WP
Read more -
Case Studies 09/24/2020
MEDISTAY HOSPITAL ACCOMODATION ( Sanipack)
OBJECTIVE: Create all-inclusive accommodation for families visiting hospital patients. CHALLENGE: Plumbing needed in a multistorey office building. SOLUTION: Sanipack
Read more -
Case Studies 09/24/2020
SANIFLO’S SANICUBIC RANGE
The perfect fully integrated pumping solution From a small granny flat to a large public building, the Sanicubic range has you covered.
Read more